Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Minnygap

Operator Renewable Energy Systems (RES)

Revised30 MWData checked 16 November 2026Source record dated 25 September 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Minnygap is a 30 MW wind farm 17 km north of Locharbriggs, Dumfries and Galloway, United Kingdom. Its planning application (05/P/4/0349) went to Dumfries and Galloway on 13 June 2005 and was refused on 26 November 2007. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 12 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Minnygap sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 54 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10252018Worker dies after becoming stranded at Afton wind farm54 kmMajor
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm68 kmSignificant
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow73 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
30 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Renewable Energy Systems (RES)
Location
Nr Annandale, Dumfries and Galloway, United Kingdom
Planning authority
Dumfries and Galloway
Planning application
05/P/4/0349
Turbines
15

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 05/P/4/0349, with what the planning evidence pack adds for this site.

Every application in Dumfries and Galloway · Alerts for applications and incidents near here

  • 13 June 2005 Planning application submitted
  • 26 November 2007 Planning permission refused

None found. The register holds no published incident that names Minnygap. If you know of one, report it (confidential reports are anonymised).

Has Minnygap had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Minnygap; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Minnygap?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 25 September 2014.
Where is Minnygap?
17 km north of Locharbriggs, Dumfries and Galloway, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).