Battery storage · United Kingdom

High Netherfauld House Farm 1, Tower Road - Battery Energy Storage System

Operator ESB (Harker) Limited

Consented503 MWData checked 16 November 2026Source record dated 18 March 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

High Netherfauld House Farm 1, Tower Road - Battery Energy Storage System is a 503 MW battery storage site 10 km south of Lanark, United Kingdom. Its planning application (ECU00006063) went to Scottish Government (S36) on 12 May 2025 and was granted on 30 June 2026. Its status in the Renewable Energy Planning Database (UK government) is consented by the scottish government. There are 54 other energy sites within 10 km, 15 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for High Netherfauld House Farm 1, Tower Road - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 251 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool251 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells326 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire449 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
503 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Consented by the Scottish Government (newer official status; the register records Application Submitted)
Operator or applicant
ESB (Harker) Limited
Location
390m Nnw/O High Netherfauld House Farm, Tower Road, Douglas, Lanarkshire, ML11 0RL, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00006063

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00006063, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

Status as recorded in the register on 13 November 2026: Application Submitted

Newer official status: Consented by the Scottish Government on 30 June 2026 (source: Scottish Government Energy Consents Unit, case ECU00006063, checked 9 Oct 2026)

The Energy Consents Unit lists the application as consented, with a signed decision letter dated 30 June 2026.

  • 12 May 2025 Planning application submitted
  • 30 June 2026 Planning permission granted

None found. The register holds no published incident that names High Netherfauld House Farm 1, Tower Road - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has High Netherfauld House Farm 1, Tower Road - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names High Netherfauld House Farm 1, Tower Road - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of High Netherfauld House Farm 1, Tower Road - Battery Energy Storage System?
Consented by the Scottish Government, in the Renewable Energy Planning Database (UK government), where it last changed on 18 March 2026.
Where is High Netherfauld House Farm 1, Tower Road - Battery Energy Storage System?
10 km south of Lanark, United Kingdom (postcode ML11 0RL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).