Buchanan Gate, Stepps - Solar Panels

Operator Scottish Water

Operational0.9 MWData checked 16 November 2026Source record dated 12 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Buchanan Gate, Stepps - Solar Panels is a 0.9 MW solar farm in Stepps, Strathclyde, United Kingdom. Its planning application (24/00356/FUL) went to North Lanarkshire on 22 April 2024 and was granted on 17 May 2024. It has been operating since 30 September 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 49 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 39 other sites and 491 energy sites within 40 km for Buchanan Gate, Stepps - Solar Panels

Members see the sites and incidents around this one, and every record behind them.

SCOTTISH WATER LIMITED (SC207004), active, since 2000. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
0.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Scottish Water
Location
6 Buchanan Gate Stepps, Strathclyde, G33 6FB, United Kingdom
Planning authority
North Lanarkshire
Planning application
24/00356/FUL
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00356/FUL, with what the planning evidence pack adds for this site.

Every application in North Lanarkshire · Alerts for applications and incidents near here

Status changed from Under Construction to Operational on 16 November 2026.

  • 22 April 2024 Planning application submitted
  • 17 May 2024 Planning permission granted
  • 1 January 2025 Construction started
  • 30 September 2026 Operational

None found. The register holds no published incident that names Buchanan Gate, Stepps - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Buchanan Gate, Stepps - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Buchanan Gate, Stepps - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Buchanan Gate, Stepps - Solar Panels?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Buchanan Gate, Stepps - Solar Panels?
In Stepps, Strathclyde, United Kingdom (postcode G33 6FB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).