Solar · United Kingdom
Morrison Bowmore Distillery, Carlisle Street - Solar Panels
Operator Beam Suntory UK Limited
Revised0.3 MWData checked 16 November 2026Source record dated 29 September 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Morrison Bowmore Distillery, Carlisle Street - Solar Panels is a 0.3 MW solar farm on the edge of Glasgow, Strathclyde, United Kingdom. Its planning application (23/00967/FUL) went to Glasgow City on 24 May 2023 and was withdrawn on 1 August 2023. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 56 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Morrison Bowmore Distillery, Carlisle Street - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Morrison Bowmore Distillery, Carlisle Street - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 53 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 53 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 105 km | Significant |
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 117 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Beam Suntory UK Limited
- Location
- Morrison Bowmore Distillery 200 Carlisle Street, Strathclyde, G21 1EQ, United Kingdom
- Planning authority
- Glasgow City
- Planning application
- 23/00967/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00967/FUL, with what the planning evidence pack adds for this site.
Every application in Glasgow City · Alerts for applications and incidents near here
Timeline
- 24 May 2023 Planning application submitted
- 1 August 2023 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Morrison Bowmore Distillery, Carlisle Street - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Morrison Bowmore Distillery, Carlisle Street - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Morrison Bowmore Distillery, Carlisle Street - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Morrison Bowmore Distillery, Carlisle Street - Solar Panels?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 29 September 2023.
- Where is Morrison Bowmore Distillery, Carlisle Street - Solar Panels?
- On the edge of Glasgow, Strathclyde, United Kingdom (postcode G21 1EQ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).