← Back to Strathclyde
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Kennoxhead Wind Farm

Operator Orsted Onshore Limited

Under Construction62 MWData checked 16 November 2026Source record dated 19 August 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kennoxhead Wind Farm is a 62 MW wind farm 21 km east of Cumnock, Strathclyde, United Kingdom. Its planning application (EC00002101) went to Scottish Government (S36) on 31 January 2013 and was granted on 23 July 2015. Construction started on 1 March 2021. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 31 other energy sites within 10 km, 23 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

7 Oct5 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

29 settled days to 5 Nov: 4,823 MWh, running 67% of half hours, peak 30 MW of 62, load factor 12%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £31,721 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kennoxhead Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10252018Worker dies after becoming stranded at Afton wind farm19 kmMajor
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow34 kmMajor
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm35 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
62 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Orsted Onshore Limited
Location
Kennoxhead, south of Hagshaw Hill, Strathclyde, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
EC00002101
Turbines
13, 180 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EC00002101, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 31 January 2013 Planning application submitted
  • 23 July 2015 Planning permission granted
  • 1 March 2021 Construction started

None found. The register holds no published incident that names Kennoxhead Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Kennoxhead Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kennoxhead Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Kennoxhead Wind Farm?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 August 2022.
Where is Kennoxhead Wind Farm?
21 km east of Cumnock, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).