← Back to Lanarkshire
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Kennoxhead Wind Farm Extension II (Penbreck) (Phase 2)

Operator Orsted Onshore Limited

Awaiting Construction45.6 MWData checked 16 November 2026Source record dated 27 May 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kennoxhead Wind Farm Extension II (Penbreck) (Phase 2) is a 45.6 MW wind farm 18 km east of Cumnock, Lanarkshire, United Kingdom. Its planning application (ECU00003263) went to Scottish Government (S36) on 30 April 2021 and was granted on 20 February 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 18 other energy sites within 10 km, 15 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kennoxhead Wind Farm Extension II (Penbreck) (Phase 2) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 17 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10252018Worker dies after becoming stranded at Afton wind farm17 kmMajor
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm33 kmSignificant
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow35 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
45.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Orsted Onshore Limited
Location
South of the A70 and south east of Muirkirk, adjacent to Kennoxhead Wind Farm, Lanarkshire, ML11 0LH, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00003263
Turbines
8, 220 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00003263, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 30 April 2021 Planning application submitted
  • 20 February 2023 Planning permission granted
  • 20 February 2028 Planning permission runs out

None found. The register holds no published incident that names Kennoxhead Wind Farm Extension II (Penbreck) (Phase 2). If you know of one, report it (confidential reports are anonymised).

Has Kennoxhead Wind Farm Extension II (Penbreck) (Phase 2) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kennoxhead Wind Farm Extension II (Penbreck) (Phase 2); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Kennoxhead Wind Farm Extension II (Penbreck) (Phase 2)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 May 2022.
Where is Kennoxhead Wind Farm Extension II (Penbreck) (Phase 2)?
18 km east of Cumnock, Lanarkshire, United Kingdom (postcode ML11 0LH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).