← Back to Strathclyde

Onshore wind · United Kingdom

Inverclyde Wind Farm (Corlic Hill)

Operator BayWa r.e. (formerly Forsa)

Operational24 MWData checked 16 November 2026Source record dated 12 April 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Inverclyde Wind Farm (Corlic Hill) is a 24 MW wind farm 3 km south-west of Port Glasgow, Strathclyde, United Kingdom. Its planning application (13/0199/IC) went to Inverclyde on 8 July 2013 and was granted on appeal on 17 May 2016. It has been operating since 20 February 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 23 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 3 other sites and 281 energy sites within 40 km for Inverclyde Wind Farm (Corlic Hill)

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
24 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
BayWa r.e. (formerly Forsa)
Location
Corlic Hill, near Greenock & Port Glasgow, Strathclyde, United Kingdom
Planning authority
Inverclyde
Planning application
13/0199/IC
Appeal reference
PPA-280-2022
First operating
2021
Turbines
8

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13/0199/IC, with what the planning evidence pack adds for this site.

Every application in Inverclyde · Alerts for applications and incidents near here

  • 8 July 2013 Planning application submitted
  • 4 December 2014 Planning permission refused
  • 3 March 2015 Appeal lodged
  • 17 May 2016 Planning permission granted
  • 17 May 2016 Appeal granted
  • 15 May 2019 Construction started
  • 20 February 2021 Operational

None found. The register holds no published incident that names Inverclyde Wind Farm (Corlic Hill). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Inverclyde Wind Farm (Corlic Hill) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Inverclyde Wind Farm (Corlic Hill); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Inverclyde Wind Farm (Corlic Hill)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 12 April 2021.
Where is Inverclyde Wind Farm (Corlic Hill)?
3 km south-west of Port Glasgow, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).