Onshore wind · United Kingdom
Inverclyde Wind Farm (Corlic Hill)
Operator BayWa r.e. (formerly Forsa)
Operational24 MWData checked 16 November 2026Source record dated 12 April 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Inverclyde Wind Farm (Corlic Hill) is a 24 MW wind farm 3 km south-west of Port Glasgow, Strathclyde, United Kingdom. Its planning application (13/0199/IC) went to Inverclyde on 8 July 2013 and was granted on appeal on 17 May 2016. It has been operating since 20 February 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 23 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Inverclyde Wind Farm (Corlic Hill) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 24 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- BayWa r.e. (formerly Forsa)
- Location
- Corlic Hill, near Greenock & Port Glasgow, Strathclyde, United Kingdom
- Planning authority
- Inverclyde
- Planning application
- 13/0199/IC
- Appeal reference
- PPA-280-2022
- First operating
- 2021
- Turbines
- 8
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 13/0199/IC, with what the planning evidence pack adds for this site.
Every application in Inverclyde · Alerts for applications and incidents near here
Timeline
- 8 July 2013 Planning application submitted
- 4 December 2014 Planning permission refused
- 3 March 2015 Appeal lodged
- 17 May 2016 Planning permission granted
- 17 May 2016 Appeal granted
- 15 May 2019 Construction started
- 20 February 2021 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Inverclyde Wind Farm (Corlic Hill). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Inverclyde Wind Farm (Corlic Hill) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Inverclyde Wind Farm (Corlic Hill); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Inverclyde Wind Farm (Corlic Hill)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 12 April 2021.
- Where is Inverclyde Wind Farm (Corlic Hill)?
- 3 km south-west of Port Glasgow, Strathclyde, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).