← Back to Inverclyde
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Dougliehill Water Treatment Works, Dougliehill Road - Battery Storage

Operator Bluestone Energy · Owner Bluestone Energy Ltd

Revised49 MWData checked 16 November 2026Source record dated 28 October 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Dougliehill Water Treatment Works, Dougliehill Road - Battery Storage is a 49 MW battery storage site in Port Glasgow, Inverclyde, United Kingdom. Its planning application (24/0053/IC) went to Inverclyde on 26 March 2024 and was withdrawn on 27 September 2024. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 22 other energy sites within 10 km, 7 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

BLUESTONE ENERGY LTD (11673645), active, since 2018. 5 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dougliehill Water Treatment Works, Dougliehill Road - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 304 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool304 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells388 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire502 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Bluestone Energy
Owner
Bluestone Energy Ltd
Location
Former Dougliehill Water Treatment Works, Dougliehill Road, Port Glasgow, Inverclyde, PA14 5AY, United Kingdom
Planning authority
Inverclyde
Planning application
24/0053/IC

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/0053/IC, with what the planning evidence pack adds for this site.

Every application in Inverclyde · Alerts for applications and incidents near here

  • 26 March 2024 Planning application submitted
  • 27 September 2024 Application withdrawn

None found. The register holds no published incident that names Dougliehill Water Treatment Works, Dougliehill Road - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Dougliehill Water Treatment Works, Dougliehill Road - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dougliehill Water Treatment Works, Dougliehill Road - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dougliehill Water Treatment Works, Dougliehill Road - Battery Storage?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 28 October 2024.
Where is Dougliehill Water Treatment Works, Dougliehill Road - Battery Storage?
In Port Glasgow, Inverclyde, United Kingdom (postcode PA14 5AY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).