Onshore wind · United Kingdom
Sorbie Farm
Operator Energiekontor · Owner Energiekontor AG
Under Construction9 MWData checked 16 November 2026Source record dated 8 December 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Sorbie Farm is a 9 MW wind farm on the edge of Ardrossan, Strathclyde, United Kingdom. Its planning application (13/00627/PP) went to North Ayrshire on 30 October 2013 and was granted on 27 June 2014. Construction started on 1 February 2022. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 47 other energy sites within 10 km, 16 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Sorbie Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
ENERGIEKONTOR UK LTD (03830819), active, since 1999. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sorbie Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1951, Investigation begins after turbine fire at Ardrossan wind farm, 3.1 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1951 | 2022 | Investigation begins after turbine fire at Ardrossan wind farm | 3.1 km | Significant |
| EIR-0922 | 2011 | Vestas turbine nacelle fire at Ardrossan wind farm during storm | 26 km | Significant |
| EIR-1157 | 2026 | Fire destroys turbine at Whitelee windfarm near Glasgow | 28 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Energiekontor
- Owner
- Energiekontor AG
- Location
- Sorbie Farm Ardrossan, Strathclyde, KA22 7NP, United Kingdom
- Planning authority
- North Ayrshire
- Planning application
- 13/00627/PP
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 13/00627/PP, with what the planning evidence pack adds for this site.
Every application in North Ayrshire · Alerts for applications and incidents near here
Timeline
- 30 October 2013 Planning application submitted
- 27 June 2014 Planning permission granted
- 1 February 2022 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Sorbie Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Sorbie Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Sorbie Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Sorbie Farm?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 December 2021.
- Where is Sorbie Farm?
- On the edge of Ardrossan, Strathclyde, United Kingdom (postcode KA22 7NP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).