← Back to Strathclyde

Onshore wind · United Kingdom

Ardeer

Operator Scottish Power Renewables

Application Withdrawn22 MWData checked 16 November 2026Source record dated 11 August 2004

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ardeer is a 22 MW wind farm in Stevenston, Strathclyde, United Kingdom. Its planning application (N/01/00766/PP) went to North Ayrshire and was withdrawn on 11 August 2004. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 46 other energy sites within 10 km, 16 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 57 other sites and 330 energy sites within 40 km for Ardeer

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
22 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Scottish Power Renewables
Location
Stevenston, Ayrshire, Strathclyde, United Kingdom
Planning authority
North Ayrshire
Planning application
N/01/00766/PP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for N/01/00766/PP, with what the planning evidence pack adds for this site.

Every application in North Ayrshire · Alerts for applications and incidents near here

  • 11 August 2004 Application withdrawn

None found. The register holds no published incident that names Ardeer. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Ardeer had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ardeer; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Ardeer?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 11 August 2004.
Where is Ardeer?
In Stevenston, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).