Onshore wind · United Kingdom
Kilgallioch wind farm
Operator Scottish Power Renewables
Operational239 MWData checked 16 November 2026Source record dated 22 February 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Kilgallioch wind farm is a 239 MW wind farm 17 km north-east of Stranraer, Dumfries and Galloway, United Kingdom. Its planning application went to Scottish Government (S36) on 5 March 2010 and was granted on 21 February 2013. It has been operating since 15 December 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 11 of them wind farms. The register holds 2 incidents at this site, the latest in 2017.
Incidents on the register at this site
2 incidents at Kilgallioch wind farm, all in 2017, 1 classed as major. Oldest first.
A 480-foot wind turbine at the Kilgallioch wind farm near Barrhill, Ayrshire, collapsed in the early hours of 13 January 2017 during a storm with 55mph gusts and snow squalls. The 160-tonne turbine, valued at around £2 million, had not yet been commissioned...
A worker died after a fall while working at Kilgallioch wind farm, which straddles Dumfries and Galloway and South Ayrshire in Scotland. Ambulance, air ambulance and coastguard resources were sent. Police said a man was pronounced dead at the scene and that...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when Kilgallioch wind farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
Outage notices at this site
1 planned or unplanned unavailability notice published under REMIT, 30 Aug 2027, 1 live now. Members see each notice: planned or unplanned, the capacity out, the dates and the cause given.
Contains BMRS data © Elexon Limited copyright and database right. Read each morning; a notice can be withdrawn or revised by the operator.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
30 settled days to 4 Nov: 26,042 MWh, running 78% of half hours, peak 109 MW of 239, load factor 15%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £158,980 at its earnings over the last 30 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The site
- Technology
- Onshore wind
- Capacity
- 239 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Scottish Power Renewables
- Location
- (Arecloch Phase 2) land five kilometres to the south of Barrhill, five kilometres to the northeast of New Luce and 11km to the northwest of Kirkcowan, Dumfries and Galloway, United Kingdom
- Planning authority
- Scottish Government (S36)
- First operating
- 2017
- Turbines
- 96
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 5 March 2010 Planning application submitted
- 21 February 2013 Planning permission granted
- 28 July 2015 Construction started
- 15 December 2017 Operational
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Kilgallioch wind farm had a fire or other incident?
- Yes. The register holds 2 incidents that name it: Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire (EIR-1134, 2017); Worker dies after fall at Kilgallioch wind farm (EIR-1077, 2017).
- What is the status of Kilgallioch wind farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 22 February 2018.
- Where is Kilgallioch wind farm?
- 17 km north-east of Stranraer, Dumfries and Galloway, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).