← Back to Ayrshire

Solar · United Kingdom

Castlehill Solar Farm

Operator SBC Renewables

Abandoned5 MWData checked 16 November 2026Source record dated 26 May 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Castlehill Solar Farm is a 5 MW solar farm in Kilwinning, Ayrshire, United Kingdom. Its planning application (15/00469/PP) went to North Ayrshire on 26 August 2015 and was granted on 16 October 2015. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 48 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 14 other sites and 336 energy sites within 40 km for Castlehill Solar Farm

Members see the sites and incidents around this one, and every record behind them.

SBC RENEWABLES LIMITED (09018276), dissolved, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
SBC Renewables
Location
Site To North East Of Castlehill Farm, Stevenston, Ayrshire, Ayrshire, KA13 6TT, United Kingdom
Planning authority
North Ayrshire
Planning application
15/00469/PP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00469/PP, with what the planning evidence pack adds for this site.

Every application in North Ayrshire · Alerts for applications and incidents near here

  • 26 August 2015 Planning application submitted
  • 16 October 2015 Planning permission granted
  • 16 October 2018 Planning permission expired

None found. The register holds no published incident that names Castlehill Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Castlehill Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Castlehill Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Castlehill Solar Farm?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 26 May 2016.
Where is Castlehill Solar Farm?
In Kilwinning, Ayrshire, United Kingdom (postcode KA13 6TT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).