← Back to Oxfordshire

Solar · United Kingdom

Wally Corner Landfill Site

Operator SBC Renewables

Operational7 MWData checked 16 November 2026Source record dated 23 November 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wally Corner Landfill Site is a 7 MW solar farm 5.4 km north-west of Benson, Oxfordshire, United Kingdom. Its planning application (P15/S2486/FUL) went to South Oxfordshire on 22 July 2015 and was granted on 29 September 2015. It has been operating since 15 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 49 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 14 other sites and 410 energy sites within 40 km for Wally Corner Landfill Site

Members see the sites and incidents around this one, and every record behind them.

SBC RENEWABLES LIMITED (09018276), dissolved, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
SBC Renewables
Location
Land off, Burcot Lane, Dorchester-on-Thames, Berinsfield, Wallingford, Oxfordshire, OX10 7, United Kingdom
Planning authority
South Oxfordshire
Planning application
P15/S2486/FUL
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P15/S2486/FUL, with what the planning evidence pack adds for this site.

Every application in South Oxfordshire · Alerts for applications and incidents near here

  • 22 July 2015 Planning application submitted
  • 29 September 2015 Planning permission granted
  • 15 October 2016 Construction started
  • 15 March 2017 Operational

None found. The register holds no published incident that names Wally Corner Landfill Site. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Wally Corner Landfill Site had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wally Corner Landfill Site; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wally Corner Landfill Site?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 November 2016.
Where is Wally Corner Landfill Site?
5.4 km north-west of Benson, Oxfordshire, United Kingdom (postcode OX10 7).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).