← Back to Bedfordshire

Solar · United Kingdom

Clapham solar farm

Operator SBC Renewables

Operational7.5 MWData checked 16 November 2026Source record dated 23 November 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Clapham solar farm is a 7.5 MW solar farm 4.8 km north of Bedford, United Kingdom. Its planning application (14/01789/MAF) went to Bedford on 18 July 2014 and was granted on 24 November 2014. It has been operating since 1 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 36 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 14 other sites and 597 energy sites within 40 km for Clapham solar farm

Members see the sites and incidents around this one, and every record behind them.

SBC RENEWABLES LIMITED (09018276), dissolved, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
7.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
SBC Renewables
Location
Land North Of And Including The Baulk Clapham, Bedfordshire, MK41 6HD, United Kingdom
Planning authority
Bedford
Planning application
14/01789/MAF
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/01789/MAF, with what the planning evidence pack adds for this site.

Every application in Bedford · Alerts for applications and incidents near here

  • 18 July 2014 Planning application submitted
  • 24 November 2014 Planning permission granted
  • 1 December 2015 Construction started
  • 1 March 2016 Operational

None found. The register holds no published incident that names Clapham solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Clapham solar farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Clapham solar farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Clapham solar farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 November 2016.
Where is Clapham solar farm?
4.8 km north of Bedford, United Kingdom (postcode MK41 6HD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).