Onshore wind · United Kingdom
Kype Muir Wind Farm
Operator Banks Renewables · Owner Onpath Energy Limited
Operational88.4 MWData checked 16 November 2026Source record dated 1 October 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Kype Muir Wind Farm is a 88.4 MW wind farm 5.3 km south of Strathaven, Strathclyde, United Kingdom. Its planning application (EK/11/0256) went to Scottish Government (S36) on 9 August 2011 and was granted on 22 May 2014. It has been operating since 15 September 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 36 other energy sites within 10 km, 32 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Kype Muir Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
28 settled days to 4 Nov: 5,955 MWh, running 70% of half hours, peak 44 MW of 88, load factor 10%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £28,504 at its earnings over the last 28 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
BANKS RENEWABLES (BOWBURN SOLAR PARK) LIMITED (13062412), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 88.4 MW (this record)
- All phases
- 156 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Banks Renewables
- Owner
- Onpath Energy Limited
- Location
- approximately 5 km south of the town of Strathaven, Strathclyde, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- EK/11/0256
- First operating
- 2019
- Turbines
- 26
This record is 88.4 MW, one part of a site built in phases. With Kype Muir Wind Farm Extension (67.2 MW) the phases on the register add up to 156 MW. Kype Muir Wind Farm Extension
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EK/11/0256, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 9 August 2011 Planning application submitted
- 22 May 2014 Planning permission granted
- 1 February 2017 Construction started
- 15 September 2019 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Kype Muir Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Kype Muir Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Kype Muir Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Kype Muir Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 October 2019.
- Where is Kype Muir Wind Farm?
- 5.3 km south of Strathaven, Strathclyde, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).