Middle Muir Wind Farm

Operator Banks Renewables · Owner Onpath Energy Limited

Operational51 MWData checked 16 November 2026Source record dated 16 May 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Middle Muir Wind Farm is a 51 MW wind farm 18 km south of Lanark, Strathclyde, United Kingdom. Its planning application (CL/12/0056) went to Scottish Government (S36) on 7 February 2012 and was granted on 26 September 2014. It has been operating since 16 May 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 39 other energy sites within 10 km, 24 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 26 other sites and 370 energy sites within 40 km for Middle Muir Wind Farm

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 4 Nov: 3,361 MWh, running 60% of half hours, peak 25 MW of 51, load factor 9%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £14,639 at its earnings over the last 30 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

BANKS RENEWABLES (BOWBURN SOLAR PARK) LIMITED (13062412), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
51 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Banks Renewables
Owner
Onpath Energy Limited
Location
Middle Muir, Hamilton, Strathclyde (north of Crawfordjohn), Strathclyde, ML3, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
CL/12/0056
First operating
2019
Turbines
15

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CL/12/0056, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 7 February 2012 Planning application submitted
  • 26 September 2014 Planning permission granted
  • 16 January 2017 Construction started
  • 16 May 2019 Operational

None found. The register holds no published incident that names Middle Muir Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Middle Muir Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Middle Muir Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Middle Muir Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 May 2019.
Where is Middle Muir Wind Farm?
18 km south of Lanark, Strathclyde, United Kingdom (postcode ML3).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).