Onshore wind · United Kingdom

National Wind Turbine Test Site

Operator NEL

Operational4.7 MWData checked 16 November 2026Source record dated 5 November 2009

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

National Wind Turbine Test Site is a 4.7 MW wind farm 9.7 km south of Newton Mearns, Strathclyde, United Kingdom. Its planning application (1999/0406/TP) went to East Renfrewshire on 19 August 1999 and was granted on 1 August 2000. It has been operating since 15 February 2001. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 51 other energy sites within 10 km, 31 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

530 energy sites within 40 km for National Wind Turbine Test Site

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
4.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
NEL
Location
National Wind Turbine Test siteMyres HillEaglesham, Strathclyde, United Kingdom
Planning authority
East Renfrewshire
Planning application
1999/0406/TP
First operating
2001
Turbines
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 1999/0406/TP, with what the planning evidence pack adds for this site.

Every application in East Renfrewshire · Alerts for applications and incidents near here

  • 19 August 1999 Planning application submitted
  • 1 August 2000 Planning permission granted
  • 15 February 2001 Operational

None found. The register holds no published incident that names National Wind Turbine Test Site. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has National Wind Turbine Test Site had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names National Wind Turbine Test Site; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of National Wind Turbine Test Site?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 November 2009.
Where is National Wind Turbine Test Site?
9.7 km south of Newton Mearns, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).