Onshore wind · United Kingdom
Whitelee Windfarm Extension Phase 1
Operator Scottish Power Renewables
Operational108 MWData checked 16 November 2026Source record dated 22 April 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Whitelee Windfarm Extension Phase 1 is a 108 MW wind farm 11 km south of Newton Mearns, Strathclyde, United Kingdom. Its planning application went to Scottish Government (S36) on 1 April 2008 and was granted on 20 May 2009. It has been operating since 31 October 2012. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 44 other energy sites within 10 km, 30 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Whitelee Windfarm Extension Phase 1 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 108 MW (this record)
- All phases
- 539 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Scottish Power Renewables
- Location
- Eaglesham Moor, to the south of Glasgow, Strathclyde, United Kingdom
- Planning authority
- Scottish Government (S36)
- First operating
- 2012
- Turbines
- 36
This record is 108 MW, one part of a site built in phases. With Whitelee Windfarm Extension phase 2 (109 MW), Whitelee (322 MW) the phases on the register add up to 539 MW. Whitelee Windfarm Extension phase 2 · Whitelee
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 1 April 2008 Planning application submitted
- 20 May 2009 Planning permission granted
- 1 December 2010 Construction started
- 31 October 2012 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Whitelee Windfarm Extension Phase 1. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Whitelee Windfarm Extension Phase 1 had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Whitelee Windfarm Extension Phase 1; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Whitelee Windfarm Extension Phase 1?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 22 April 2013.
- Where is Whitelee Windfarm Extension Phase 1?
- 11 km south of Newton Mearns, Strathclyde, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).