Onshore wind · United Kingdom
Myres Hill Wind Turbine Test Centre
Operator South Seeds
Application Withdrawn1 MWData checked 16 November 2026Source record dated 24 September 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Myres Hill Wind Turbine Test Centre is a 1 MW wind farm 9.7 km south of Newton Mearns, Renfrewshire, United Kingdom. Its planning application (2019/0069/TP) went to East Renfrewshire on 1 February 2019 and was withdrawn on 24 September 2019. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 51 other energy sites within 10 km, 31 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Myres Hill Wind Turbine Test Centre changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- South Seeds
- Location
- Myres Hill Wind Turbine Test S, Enoch Road, Eaglesham, Glasgow, Strathclyde, Renfrewshire, G76, United Kingdom
- Planning authority
- East Renfrewshire
- Planning application
- 2019/0069/TP
- Turbines
- 2, 37 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2019/0069/TP, with what the planning evidence pack adds for this site.
Every application in East Renfrewshire · Alerts for applications and incidents near here
Timeline
- 1 February 2019 Planning application submitted
- 24 September 2019 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Myres Hill Wind Turbine Test Centre. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Myres Hill Wind Turbine Test Centre had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Myres Hill Wind Turbine Test Centre; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Myres Hill Wind Turbine Test Centre?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 24 September 2019.
- Where is Myres Hill Wind Turbine Test Centre?
- 9.7 km south of Newton Mearns, Renfrewshire, United Kingdom (postcode G76).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).