Whitelee is a 322 MW wind farm 11 km south of Newton Mearns, Strathclyde, United Kingdom. Its planning application (2002/0001/EB) went to Scottish Government (S36) on 23 January 2002 and was granted on 1 April 2006. It has been operating since 14 December 2007. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 46 other energy sites within 10 km, 31 of them wind farms. The register holds 2 incidents at this site, the latest in 2026.
Incidents on the register at this site
2 incidents at Whitelee, from 2017 to 2026, 1 classed as major. Oldest first.
A 32 year old man fell to his death from a turbine at Whitelee Windfarm near Eaglesham, East Renfrewshire, Scotland. The incident occurred on a Wednesday in late March 2017 while the turbine involved was reportedly undergoing maintenance, although the...
On the evening of Thursday 17 September, one of the 215 turbines at Whitelee Windfarm near Glasgow caught fire. Pictures shared with the reporting newspaper showed the turbine's charred head and blackened blades on the roughly 65-metre-tall hub, described as...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when Whitelee changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
Outage notices at this site
1 planned or unplanned unavailability notice published under REMIT, 25 Oct 2026. Members see each notice: planned or unplanned, the capacity out, the dates and the cause given.
Contains BMRS data © Elexon Limited copyright and database right. Read each morning; a notice can be withdrawn or revised by the operator.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
29 settled days to 4 Nov: 12,025 MWh, running 72% of half hours, peak 82 MW of 322, load factor 5%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £71,890 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The site
- Technology
- Onshore wind
- Capacity
- 322 MW (this record)
- All phases
- 539 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- CRE Energy& Scottish Power
- Location
- Eaglesham Moor, Whitelee Forest, Fenwick Moor, East Kilbride, South of Glasgow, Strathclyde, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- 2002/0001/EB
- First operating
- 2007
- Turbines
- 140
This record is 322 MW, one part of a site built in phases. With Whitelee Windfarm Extension phase 2 (109 MW), Whitelee Windfarm Extension Phase 1 (108 MW) the phases on the register add up to 539 MW. Whitelee Windfarm Extension phase 2 · Whitelee Windfarm Extension Phase 1
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2002/0001/EB, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 23 January 2002 Planning application submitted
- 1 April 2006 Planning permission granted
- 1 December 2006 Construction started
- 14 December 2007 Operational
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Whitelee had a fire or other incident?
- Yes. The register holds 2 incidents that name it: Worker dies after fall from turbine at Whitelee windfarm near Glasgow (EIR-0911, 2017); Fire destroys turbine at Whitelee windfarm near Glasgow (EIR-1157, 2026).
- What is the status of Whitelee?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 May 2010.
- Where is Whitelee?
- 11 km south of Newton Mearns, Strathclyde, United Kingdom.