← Back to Strathclyde

Onshore wind · United Kingdom

Whitelee Windfarm Extension phase 2

Operator Scottish Power

Operational109 MWData checked 16 November 2026Source record dated 19 April 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Whitelee Windfarm Extension phase 2 is a 109 MW wind farm 12 km east of Kilmarnock, Strathclyde, United Kingdom. Its planning application (WHX/02/040/0162) went to Scottish Government (S36) on 29 May 2009 and was granted on 12 December 2009. It has been operating since 15 January 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 24 other energy sites within 10 km, 20 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 2 other sites and 533 energy sites within 40 km for Whitelee Windfarm Extension phase 2

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
109 MW (this record)
All phases
539 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Scottish Power
Location
north of the Irvine Valley on Eaglesham Moor, Strathclyde, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
WHX/02/040/0162
First operating
2013
Turbines
36

This record is 109 MW, one part of a site built in phases. With Whitelee (322 MW), Whitelee Windfarm Extension Phase 1 (108 MW) the phases on the register add up to 539 MW. Whitelee · Whitelee Windfarm Extension Phase 1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WHX/02/040/0162, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 29 May 2009 Planning application submitted
  • 12 December 2009 Planning permission granted
  • 1 December 2010 Construction started
  • 15 January 2013 Operational

None found. The register holds no published incident that names Whitelee Windfarm Extension phase 2. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Whitelee Windfarm Extension phase 2 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Whitelee Windfarm Extension phase 2; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Whitelee Windfarm Extension phase 2?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 19 April 2013.
Where is Whitelee Windfarm Extension phase 2?
12 km east of Kilmarnock, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).