Battery storage · United Kingdom

Carland Cross Wind Farm - Storage

Operator Scottish Power

Under Construction1 MWData checked 16 November 2026Source record dated 10 March 2020

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Carland Cross Wind Farm - Storage is a 1 MW battery storage site 7.5 km south of Newquay, Cornwall, United Kingdom. Its planning application (PA18/09608) went to Cornwall on 12 August 2018. Construction started on 1 February 2020. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 49 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Carland Cross Wind Farm - Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 118 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter118 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire265 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool368 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Scottish Power
Location
Wind Farm Carland Cross Mitchell Newquay Cornwall, Cornwall, TR8 5AY, United Kingdom
Planning authority
Cornwall
Planning application
PA18/09608

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA18/09608, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 12 August 2018 Planning application submitted
  • 1 February 2020 Construction started

None found. The register holds no published incident that names Carland Cross Wind Farm - Storage. If you know of one, report it (confidential reports are anonymised).

Has Carland Cross Wind Farm - Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Carland Cross Wind Farm - Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Carland Cross Wind Farm - Storage?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 March 2020.
Where is Carland Cross Wind Farm - Storage?
7.5 km south of Newquay, Cornwall, United Kingdom (postcode TR8 5AY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).