← Back to Cornwall

Onshore wind · United Kingdom

Carland Cross Wind Farm Repowering

Operator Scottish Power Renewables

Operational20 MWData checked 16 November 2026Source record dated 1 November 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Carland Cross Wind Farm Repowering is a 20 MW wind farm 7.8 km south-east of Newquay, Cornwall, United Kingdom. Its planning application (EA28/2038/08/B) went to Cornwall on 24 November 2008 and was granted on appeal on 20 January 2010. It has been operating since 30 October 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 48 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 57 other sites and 189 energy sites within 40 km for Carland Cross Wind Farm Repowering

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Scottish Power Renewables
Location
Carland Cross, Mitchell, Truro, Cornwall, United Kingdom
Planning authority
Cornwall
Planning application
EA28/2038/08/B
First operating
2013
Turbines
10

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EA28/2038/08/B, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 24 November 2008 Planning application submitted
  • 19 March 2009 Planning permission refused
  • 20 January 2010 Planning permission granted
  • 20 January 2010 Appeal granted
  • 23 January 2013 Construction started
  • 30 October 2013 Operational

None found. The register holds no published incident that names Carland Cross Wind Farm Repowering. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Carland Cross Wind Farm Repowering had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Carland Cross Wind Farm Repowering; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Carland Cross Wind Farm Repowering?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 November 2013.
Where is Carland Cross Wind Farm Repowering?
7.8 km south-east of Newquay, Cornwall, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).