← Back to Cornwall

Solar · United Kingdom

Hendra Barns Solar Farm

Operator Caledon Partners (Smarter Energy Solutions Ltd)

Planning Permission Expired15 MWData checked 16 November 2026Source record dated 21 March 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hendra Barns Solar Farm is a 15 MW solar farm 8.8 km north of Truro, Cornwall, United Kingdom. Its planning application (PA13/02466) went to Cornwall on 21 March 2013 and was granted on 8 July 2013. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 55 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

189 energy sites within 40 km for Hendra Barns Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
15 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Caledon Partners (Smarter Energy Solutions Ltd)
Location
Land Adj Hendra Barns Mitchell Cornwall, Cornwall, TR8 5AZ, United Kingdom
Planning authority
Cornwall
Planning application
PA13/02466

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA13/02466, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 21 March 2013 Planning application submitted
  • 8 July 2013 Planning permission granted
  • 8 July 2016 Planning permission expired

None found. The register holds no published incident that names Hendra Barns Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hendra Barns Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hendra Barns Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hendra Barns Solar Farm?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 21 March 2018.
Where is Hendra Barns Solar Farm?
8.8 km north of Truro, Cornwall, United Kingdom (postcode TR8 5AZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).