← Back to Strathclyde

Onshore wind · United Kingdom

Whitelee Windfarm Extension Phase 3

Operator Scottish Power Renewables

Appeal Refused12 MWData checked 16 November 2026Source record dated 1 November 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Whitelee Windfarm Extension Phase 3 is a 12 MW wind farm 11 km south of Newton Mearns, Strathclyde, United Kingdom. Its planning application went to Scottish Government (S36) on 13 August 2012 and was refused on appeal on 19 October 2016. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 44 other energy sites within 10 km, 30 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 57 other sites and 528 energy sites within 40 km for Whitelee Windfarm Extension Phase 3

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
12 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Refused
Operator or applicant
Scottish Power Renewables
Location
Eaglesham Moor, to the south of Glasgow, Strathclyde, United Kingdom
Planning authority
Scottish Government (S36)
Appeal reference
WIN-190-1
Turbines
5

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 13 August 2012 Planning application submitted
  • 30 October 2014 Appeal lodged
  • 19 October 2016 Planning permission refused
  • 19 October 2016 Appeal refused

None found. The register holds no published incident that names Whitelee Windfarm Extension Phase 3. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Whitelee Windfarm Extension Phase 3 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Whitelee Windfarm Extension Phase 3; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Whitelee Windfarm Extension Phase 3?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 1 November 2016.
Where is Whitelee Windfarm Extension Phase 3?
11 km south of Newton Mearns, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).