Battery storage · United Kingdom
Hare Hill Wind Farm Repowering
Operator SSE Renewables · Owner Sse PLC
Application SubmittedData checked 16 November 2026Source record dated 21 April 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Hare Hill Wind Farm Repowering is a battery storage site Strathclyde, United Kingdom. Its planning application (ECU00004967) went to Scottish Government (S36) on 26 January 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Hare Hill Wind Farm Repowering changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
SSE RENEWABLES LIMITED (SC435847), active, since 2012. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hare Hill Wind Farm Repowering sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, newest first. This site has no map point in the dataset, so the pack lists them newest first.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0249 | 2026 | Smoke and fire incident at Battery Box, Pinhoe Road, Exeter | not mapped | Significant |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | not mapped | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | not mapped | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- SSE Renewables
- Owner
- Sse PLC
- Location
- Near New Cumnock, Strathclyde, KA18, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00004967
The planning application page for ECU00004967, with what the planning evidence pack adds for this site.
Timeline
- 26 January 2026 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Hare Hill Wind Farm Repowering. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hare Hill Wind Farm Repowering had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hare Hill Wind Farm Repowering; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hare Hill Wind Farm Repowering?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 21 April 2026.
- Where is Hare Hill Wind Farm Repowering?
- Strathclyde, United Kingdom (postcode KA18).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.