Planning pack for this site, £295Other options

Battery storage · United Kingdom

Monk Fryston Battery Storage

Operator SSE Renewables · Owner Sse PLC

Under Construction320 MWData checked 16 November 2026Source record dated 14 October 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Monk Fryston Battery Storage is a 320 MW battery storage site 4.8 km south of Sherburn in Elmet, North Yorkshire, United Kingdom. Its planning application (2021/0789/FULM) went to North Yorkshire on 23 June 2021 and was granted on appeal on 1 December 2022. Construction started on 1 April 2024. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 67 other energy sites within 10 km, 29 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

SSE RENEWABLES LIMITED (SC435847), active, since 2012. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Monk Fryston Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 71 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells71 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool116 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire231 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
320 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
SSE Renewables
Owner
Sse PLC
Location
Land South Of Electricity Substation Rawfield Lane, Fairburn, Selby, North Yorkshire, LS25 5JB, United Kingdom
Planning authority
North Yorkshire
Planning application
2021/0789/FULM
Appeal reference
APP/N2739/W/22/3300623

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2021/0789/FULM, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 23 June 2021 Planning application submitted
  • 15 December 2021 Planning permission refused
  • 7 June 2022 Appeal lodged
  • 1 December 2022 Planning permission granted
  • 1 December 2022 Appeal granted
  • 1 April 2024 Construction started

None found. The register holds no published incident that names Monk Fryston Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Monk Fryston Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Monk Fryston Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Monk Fryston Battery Storage?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 October 2025.
Where is Monk Fryston Battery Storage?
4.8 km south of Sherburn in Elmet, North Yorkshire, United Kingdom (postcode LS25 5JB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).