← Back to Strathclyde

Onshore wind · United Kingdom

Blary Hill Wind Farm

Operator Renewables Infrastructure Group & Renewable Energy Systems (RES) · Owner Blary Hill Energy Limited

Operational35 MWData checked 16 November 2026Source record dated 16 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Blary Hill Wind Farm is a 35 MW wind farm 27 km west of Isle of Arran, Strathclyde, United Kingdom. Its planning application (14/01978/PP) went to Argyll and Bute on 22 August 2014 and was granted on appeal on 23 June 2017. It has been operating since 1 January 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 22 other energy sites within 10 km, 19 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

48 energy sites within 40 km for Blary Hill Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
35 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Renewables Infrastructure Group & Renewable Energy Systems (RES)
Owner
Blary Hill Energy Limited
Location
Land North Of Loch Arnicle (including C20 To The A83T) Barr Glen By Glenbarr Argyll And Bute, Strathclyde, United Kingdom
Planning authority
Argyll and Bute
Planning application
14/01978/PP
Appeal reference
PPA-130-2052
First operating
2022
Turbines
14, 110 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/01978/PP, with what the planning evidence pack adds for this site.

Every application in Argyll and Bute · Alerts for applications and incidents near here

  • 22 August 2014 Planning application submitted
  • 30 April 2015 Planning permission refused
  • 1 June 2015 Appeal lodged
  • 23 June 2017 Planning permission granted
  • 23 June 2017 Appeal granted
  • 25 May 2020 Construction started
  • 1 January 2022 Operational

None found. The register holds no published incident that names Blary Hill Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Blary Hill Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Blary Hill Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Blary Hill Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 January 2026.
Where is Blary Hill Wind Farm?
27 km west of Isle of Arran, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).