Planning application · Onshore wind · Argyll and Bute

Blary Hill Wind Farm

Operational35 MWApplication 14/01978/PPSubmitted 22 August 2014Granted on appeal 23 June 2017

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
14/01978/PP
Planning authority
Argyll and Bute
County or area
Strathclyde
Nation
Scotland
Technology
Onshore wind
Capacity
35 MW
Status
Operational
Operator or applicant
Renewables Infrastructure Group / Renewable Energy Systems (RES)
Location
Land North Of Loch Arnicle (including C20 To The A83T) Barr Glen By Glenbarr Argyll And Bute
Appeal reference
PPA-130-2052
Turbines
14, 110 m to tip
First operating
2022
  • 22 August 2014 Planning application submitted
  • 30 April 2015 Planning permission refused
  • 1 June 2015 Appeal lodged
  • 23 June 2017 Planning permission granted
  • 23 June 2017 Appeal granted
  • 25 May 2020 Construction started
  • 1 January 2022 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1951, Investigation begins after turbine fire at Ardrossan wind farm, 53 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-19512022Investigation begins after turbine fire at Ardrossan wind farm53 kmSignificant
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm72 kmSignificant
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire76 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Blary Hill Wind Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Argyll and Bute.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.