Beinn an Tuirc Windfarm Phase 3 is a 49.9 MW wind farm 25 km west of Isle of Arran, Strathclyde, United Kingdom. Its planning application (15/03057/PP) went to Argyll and Bute on 3 November 2015 and was granted on 23 February 2017. Construction started on 1 February 2020. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 20 other energy sites within 10 km, 17 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Beinn an Tuirc Windfarm Phase 3 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Beinn an Tuirc Windfarm Phase 3 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1951, Investigation begins after turbine fire at Ardrossan wind farm, 51 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1951 | 2022 | Investigation begins after turbine fire at Ardrossan wind farm | 51 km | Significant |
| EIR-0922 | 2011 | Vestas turbine nacelle fire at Ardrossan wind farm during storm | 70 km | Significant |
| EIR-1134 | 2017 | Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire | 72 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Scottish Power Renewables
- Location
- Beinn An Tuirc Windfarm, Land At Meall Buidhe And South, A Chruach West Of Saddell Kin, Campbeltown, Strathclyde, Scotland, Strathclyde, PA28, United Kingdom
- Planning authority
- Argyll and Bute
- Planning application
- 15/03057/PP
- Turbines
- 19
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/03057/PP, with what the planning evidence pack adds for this site.
Every application in Argyll and Bute · Alerts for applications and incidents near here
Timeline
- 3 November 2015 Planning application submitted
- 23 February 2017 Planning permission granted
- 1 February 2020 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Beinn an Tuirc Windfarm Phase 3. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Beinn an Tuirc Windfarm Phase 3 had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Beinn an Tuirc Windfarm Phase 3; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Beinn an Tuirc Windfarm Phase 3?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 May 2020.
- Where is Beinn an Tuirc Windfarm Phase 3?
- 25 km west of Isle of Arran, Strathclyde, United Kingdom (postcode PA28).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).