← Back to Strathclyde
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Dungavel House, IRC Muirkirk Road - Wind Farm

Operator Clean Earth Energy Limited

Awaiting Construction11.4 MWData checked 16 November 2026Source record dated 31 October 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dungavel House, IRC Muirkirk Road - Wind Farm is a 11.4 MW wind farm 8.5 km south-west of Strathaven, Strathclyde, United Kingdom. Its planning application (P/22/1139) went to South Lanarkshire on 8 August 2022 and was granted on 22 January 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 27 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

CLEAN EARTH ENERGY LIMITED (07225190), active, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dungavel House, IRC Muirkirk Road - Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10252018Worker dies after becoming stranded at Afton wind farm14 kmMajor
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow17 kmMajor
EIR-11572026Fire destroys turbine at Whitelee windfarm near Glasgow21 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
11.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Clean Earth Energy Limited
Location
750M Southeast Of Dungavel House IRC Muirkirk Road, Strathclyde, ML10 6RF, United Kingdom
Planning authority
South Lanarkshire
Planning application
P/22/1139
Turbines
3, 149.9 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/22/1139, with what the planning evidence pack adds for this site.

Every application in South Lanarkshire · Alerts for applications and incidents near here

  • 8 August 2022 Planning application submitted
  • 22 January 2025 Planning permission granted

None found. The register holds no published incident that names Dungavel House, IRC Muirkirk Road - Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Dungavel House, IRC Muirkirk Road - Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dungavel House, IRC Muirkirk Road - Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Dungavel House, IRC Muirkirk Road - Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 31 October 2025.
Where is Dungavel House, IRC Muirkirk Road - Wind Farm?
8.5 km south-west of Strathaven, Strathclyde, United Kingdom (postcode ML10 6RF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).