Glasgow Airport Solar Farm

Operator AGS Airports Limited

Operational19.9 MWData checked 16 November 2026Source record dated 23 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Glasgow Airport Solar Farm is a 19.9 MW solar farm on the edge of Renfrew, Strathclyde, United Kingdom. Its planning application (22/0746/PP) went to Renfrewshire on 9 November 2022 and was granted on 6 April 2023. It has been operating since 20 October 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 60 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 428 energy sites within 40 km for Glasgow Airport Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
19.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
AGS Airports Limited
Location
50 Metres East Of Walkinshaw Gardens Barnsford Road Paisley, Strathclyde, PA3 2SX, United Kingdom
Planning authority
Renfrewshire
Planning application
22/0746/PP
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/0746/PP, with what the planning evidence pack adds for this site.

Every application in Renfrewshire · Alerts for applications and incidents near here

Status changed from Under Construction to Operational on 16 November 2026.

  • 9 November 2022 Planning application submitted
  • 6 April 2023 Planning permission granted
  • 28 November 2023 Construction started
  • 20 October 2026 Operational

None found. The register holds no published incident that names Glasgow Airport Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Glasgow Airport Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Glasgow Airport Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Glasgow Airport Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Glasgow Airport Solar Farm?
On the edge of Renfrew, Strathclyde, United Kingdom (postcode PA3 2SX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).