Cpi Medicines Manufacturing Centre, Netherton Square - Solar Panels

Operator CPI

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 8 March 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cpi Medicines Manufacturing Centre, Netherton Square - Solar Panels is a 0.2 MW solar farm on the edge of Paisley, Strathclyde, United Kingdom. Its planning application (23/0257/PP) went to Renfrewshire on 3 July 2023 and was granted on 30 January 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 62 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cpi Medicines Manufacturing Centre, Netherton Square - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 65 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline65 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School113 kmSignificant
EIR-14762026House fire reported to have started on solar panels in Carnoustie128 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
CPI
Location
Cpi Medicines Manufacturing Innovation Centre, 1 Netherton Square, Paisley, Strathclyde, PA3 2EF, United Kingdom
Planning authority
Renfrewshire
Planning application
23/0257/PP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/0257/PP, with what the planning evidence pack adds for this site.

Every application in Renfrewshire · Alerts for applications and incidents near here

  • 3 July 2023 Planning application submitted
  • 30 January 2024 Planning permission granted
  • 30 January 2027 Planning permission runs out

None found. The register holds no published incident that names Cpi Medicines Manufacturing Centre, Netherton Square - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Cpi Medicines Manufacturing Centre, Netherton Square - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cpi Medicines Manufacturing Centre, Netherton Square - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cpi Medicines Manufacturing Centre, Netherton Square - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 March 2024.
Where is Cpi Medicines Manufacturing Centre, Netherton Square - Solar Panels?
On the edge of Paisley, Strathclyde, United Kingdom (postcode PA3 2EF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).