← Back to Strathclyde

Onshore wind · United Kingdom

Muirhall

Operator Lomond Energy

Operational12.3 MWData checked 16 November 2026Source record dated 16 August 2011

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Muirhall is a 12.3 MW wind farm 11 km south of Blackburn, Strathclyde, United Kingdom. Its planning application (CL/05/0209) went to South Lanarkshire on 30 March 2005 and was granted on 10 October 2008. It has been operating since 1 January 2011. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 23 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 5 other sites and 463 energy sites within 40 km for Muirhall

Members see the sites and incidents around this one, and every record behind them.

LOMOND ENERGY LTD. (SC254575), liquidation, since 2003. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
12.3 MW (this record)
All phases
19.1 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lomond Energy
Location
Stellashaw Moss, South Lanarkshire, Strathclyde, United Kingdom
Planning authority
South Lanarkshire
Planning application
CL/05/0209
First operating
2011
Turbines
6

This record is 12.3 MW, one part of a site built in phases. With Muirhall Extension (6.8 MW) the phases on the register add up to 19.1 MW. Muirhall Extension

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CL/05/0209, with what the planning evidence pack adds for this site.

Every application in South Lanarkshire · Alerts for applications and incidents near here

  • 30 March 2005 Planning application submitted
  • 10 October 2008 Planning permission granted
  • 1 January 2011 Operational

None found. The register holds no published incident that names Muirhall. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Muirhall had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Muirhall; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Muirhall?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 August 2011.
Where is Muirhall?
11 km south of Blackburn, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).