← Back to Strathclyde

Onshore wind · United Kingdom

Muirhall South

Operator Muirhall Energy

Operational8.3 MWData checked 16 November 2026Source record dated 17 March 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Muirhall South is a 8.3 MW wind farm 12 km south of Blackburn, Strathclyde, United Kingdom. Its planning application (CL/14/0113) went to South Lanarkshire on 18 March 2014 and was granted on appeal on 10 July 2015. It has been operating since 17 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 29 other energy sites within 10 km, 26 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 10 other sites and 468 energy sites within 40 km for Muirhall South

Members see the sites and incidents around this one, and every record behind them.

MUIRHALL ENERGY LIMITED (SC355143), active, since 2009. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
8.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Muirhall Energy
Location
Stellashaw Moss, South Lanarkshire, Strathclyde, United Kingdom
Planning authority
South Lanarkshire
Planning application
CL/14/0113
Appeal reference
PPA-380-2050
First operating
2016
Turbines
3, 147 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CL/14/0113, with what the planning evidence pack adds for this site.

Every application in South Lanarkshire · Alerts for applications and incidents near here

  • 18 March 2014 Planning application submitted
  • 7 November 2014 Planning permission refused
  • 22 December 2014 Appeal lodged
  • 10 July 2015 Planning permission granted
  • 10 July 2015 Appeal granted
  • 21 January 2016 Construction started
  • 17 March 2016 Operational

None found. The register holds no published incident that names Muirhall South. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Muirhall South had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Muirhall South; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Muirhall South?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 March 2016.
Where is Muirhall South?
12 km south of Blackburn, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).