Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Loganhead Wind Farm

Operator Muirhall Energy

Revised25.6 MWData checked 16 November 2026Source record dated 23 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Loganhead Wind Farm is a 25.6 MW wind farm 23 km north-east of Annan, Dumfries and Galloway, United Kingdom. Its planning application (15/P/4/0273) went to Dumfries and Galloway on 2 October 2015 and was granted on 3 April 2019. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 16 other energy sites within 10 km, 12 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

MUIRHALL ENERGY LIMITED (SC355143), active, since 2009. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Loganhead Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 82 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10252018Worker dies after becoming stranded at Afton wind farm82 kmMajor
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm97 kmSignificant
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow98 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
25.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Muirhall Energy
Location
Land Forming Part Of Loganhead Commercial Forestry, Approx 4km To The NW Of Langholm and 15km To The NE Of Lockerbie, Dumfries and Galloway, United Kingdom
Planning authority
Dumfries and Galloway
Planning application
15/P/4/0273
Turbines
8, 130 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/P/4/0273, with what the planning evidence pack adds for this site.

Every application in Dumfries and Galloway · Alerts for applications and incidents near here

  • 2 October 2015 Planning application submitted
  • 3 April 2019 Planning permission granted
  • 3 April 2022 Planning permission expired

None found. The register holds no published incident that names Loganhead Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Loganhead Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Loganhead Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Loganhead Wind Farm?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 23 September 2020.
Where is Loganhead Wind Farm?
23 km north-east of Annan, Dumfries and Galloway, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).