Onshore wind · United Kingdom

Priestgill Wind Farm

Operator Muirhall Energy · Owner Priestgill Wind Farm Limited

Under Construction46.2 MWData checked 16 November 2026Source record dated 16 December 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Priestgill Wind Farm is a 46.2 MW wind farm 20 km south-east of Lanark, United Kingdom. Its planning application (CL/17/0009) went to South Lanarkshire on 13 December 2016 and was granted on 15 December 2021. Construction started on 1 September 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 18 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

10 settled days to 4 Nov: no output settled. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

MUIRHALL ENERGY LIMITED (SC355143), active, since 2009. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Priestgill Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 38 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10252018Worker dies after becoming stranded at Afton wind farm38 kmMajor
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow47 kmMajor
EIR-11572026Fire destroys turbine at Whitelee windfarm near Glasgow52 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
46.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Muirhall Energy
Owner
Priestgill Wind Farm Limited
Location
Priestgill Wind Farm, Little Gill Farm, Abington, Biggar, Strathclyde, Lanarkshire, ML12 6RW, United Kingdom
Planning authority
South Lanarkshire
Planning application
CL/17/0009
Appeal reference
PPA-380-2075
Turbines
7, 200 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CL/17/0009, with what the planning evidence pack adds for this site.

Every application in South Lanarkshire · Alerts for applications and incidents near here

  • 13 December 2016 Planning application submitted
  • 16 August 2017 Planning permission refused
  • 14 November 2017 Appeal lodged
  • 7 December 2018 Appeal granted
  • 15 December 2021 Planning permission granted
  • 1 September 2025 Construction started

None found. The register holds no published incident that names Priestgill Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Priestgill Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Priestgill Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Priestgill Wind Farm?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 December 2025.
Where is Priestgill Wind Farm?
20 km south-east of Lanark, United Kingdom (postcode ML12 6RW).