Onshore wind · United Kingdom
Clyde Wind Farm Extension (Clyde 2)
Operator Scottish and Southern Energy (SSE)& GIB
Operational173 MWData checked 16 November 2026Source record dated 1 June 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Clyde Wind Farm Extension (Clyde 2) is a 173 MW wind farm 24 km south-east of Lanark, Strathclyde, United Kingdom. Its planning application (EC00003160) went to Scottish Government (S36) on 10 October 2011 and was granted on 23 July 2014. It has been operating since 15 August 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Clyde Wind Farm Extension (Clyde 2) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 173 MW (this record)
- All phases
- 523 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Scottish and Southern Energy (SSE)& GIB
- Location
- Upper Clyde Valley, surrounding Camps Reservoir, Strathclyde, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- EC00003160
- First operating
- 2017
- Turbines
- 54
This record is 173 MW, one part of a site built in phases. With Clyde Wind Farm (350 MW) the phases on the register add up to 523 MW. Clyde Wind Farm
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EC00003160, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 10 October 2011 Planning application submitted
- 23 July 2014 Planning permission granted
- 20 July 2015 Construction started
- 15 August 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Clyde Wind Farm Extension (Clyde 2). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Clyde Wind Farm Extension (Clyde 2) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Clyde Wind Farm Extension (Clyde 2); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Clyde Wind Farm Extension (Clyde 2)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 June 2018.
- Where is Clyde Wind Farm Extension (Clyde 2)?
- 24 km south-east of Lanark, Strathclyde, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).