Clyde Wind Farm

Operator Scottish and Southern Energy (SSE)& Greencoat UK Wind

Operational350 MWData checked 16 November 2026Source record dated 1 June 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Clyde Wind Farm is a 350 MW wind farm 30 km south-east of Lanark, Strathclyde, United Kingdom. Its planning application went to Scottish Government (S36) on 1 October 2004 and was granted on 21 July 2008. It has been operating since 1 October 2012. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

212 energy sites within 40 km for Clyde Wind Farm

Members see the sites and incidents around this one, and every record behind them.

7 Oct5 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 5 Nov: 60,037 MWh, running 89% of half hours, peak 92 MW of 350, load factor 25%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £322,692 at its earnings over the last 30 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
350 MW (this record)
All phases
523 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Scottish and Southern Energy (SSE)& Greencoat UK Wind
Location
Clyde Wind farm, Lowther Hills, between Crawford and Nether Howecleuch,NW of Lockerbie, Strathclyde, United Kingdom
Planning authority
Scottish Government (S36)
First operating
2012
Turbines
152

This record is 350 MW, one part of a site built in phases. With Clyde Wind Farm Extension (Clyde 2) (173 MW) the phases on the register add up to 523 MW. Clyde Wind Farm Extension (Clyde 2)

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 1 October 2004 Planning application submitted
  • 21 July 2008 Planning permission granted
  • 1 October 2012 Operational

None found. The register holds no published incident that names Clyde Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Clyde Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Clyde Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Clyde Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 June 2018.
Where is Clyde Wind Farm?
30 km south-east of Lanark, Strathclyde, United Kingdom.