Onshore wind · United Kingdom
Whitelaw Brae Wind Farm
Operator Thrive Renewables
Under Construction57 MWData checked 16 November 2026Source record dated 10 February 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Whitelaw Brae Wind Farm is a 57 MW wind farm 27 km south-west of Peebles, Strathclyde, United Kingdom. Its planning application (EC00002090) went to Scottish Government (S36) on 19 January 2015 and was granted on appeal on 7 December 2017. Construction started on 1 October 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 12 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Whitelaw Brae Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
THRIVE RENEWABLES PLC (02978651), active, since 1994. 6 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Whitelaw Brae Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 48 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1025 | 2018 | Worker dies after becoming stranded at Afton wind farm | 48 km | Major |
| EIR-0911 | 2017 | Worker dies after fall from turbine at Whitelee windfarm near Glasgow | 57 km | Major |
| EIR-1157 | 2026 | Fire destroys turbine at Whitelee windfarm near Glasgow | 63 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 57 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Thrive Renewables
- Location
- Whitelaw Brae Wind Farm, Tweedsmuir, Biggar, Strathclyde, ML12 6QS, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- EC00002090
- Appeal reference
- WIN-140-4
- Turbines
- 14, 136 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EC00002090, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 19 January 2015 Planning application submitted
- 25 November 2015 Appeal lodged
- 7 December 2017 Planning permission granted
- 7 December 2017 Appeal granted
- 1 October 2025 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Whitelaw Brae Wind Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Whitelaw Brae Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Whitelaw Brae Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Whitelaw Brae Wind Farm?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 February 2026.
- Where is Whitelaw Brae Wind Farm?
- 27 km south-west of Peebles, Strathclyde, United Kingdom (postcode ML12 6QS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).