Onshore wind · United Kingdom

Abergorki Wind Farm

Operator Thrive Renewables

Awaiting Construction13.5 MWData checked 16 November 2026Source record dated 4 November 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Abergorki Wind Farm is a 13.5 MW wind farm on the edge of Treorchy, Mid Glamorgan, United Kingdom. Its planning application (13/0663/10) went to Rhondda Cynon Taf on 27 June 2013 and was granted on 23 July 2015. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 40 other energy sites within 10 km, 23 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

THRIVE RENEWABLES PLC (02978651), active, since 1994. 6 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Abergorki Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0794, Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch, 9.9 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07942022Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch9.9 kmSignificant
EIR-08742026Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales54 kmSignificant
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition70 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
13.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Thrive Renewables
Location
Craig yr Aber, Land North-East of Ffoch-orky, Treorchy, Rhondda Cynon Taf, Mid Glamorgan, CF42 6TF, United Kingdom
Planning authority
Rhondda Cynon Taf
Planning application
13/0663/10
Turbines
3, 149.9 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13/0663/10, with what the planning evidence pack adds for this site.

Every application in Rhondda Cynon Taf · Alerts for applications and incidents near here

  • 27 June 2013 Planning application submitted
  • 23 July 2015 Planning permission granted
  • 23 July 2018 Planning permission expired

None found. The register holds no published incident that names Abergorki Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Abergorki Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Abergorki Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Abergorki Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 November 2024.
Where is Abergorki Wind Farm?
On the edge of Treorchy, Mid Glamorgan, United Kingdom (postcode CF42 6TF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).