Planning pack for this site, £295Other options

Battery storage · United Kingdom

Silver Spinney Farm

Operator Thrive Renewables · Owner Thrive Renewables (Wicken) Limited

Under Construction5 MWData checked 16 November 2026Source record dated 19 April 2021

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Silver Spinney Farm is a 5 MW battery storage site 7.9 km north-east of Buckingham, Northamptonshire, United Kingdom. Its planning application (S/2019/0086/FUL) went to West Northamptonshire on 14 January 2019. Construction started on 19 April 2021. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 60 other energy sites within 10 km, 20 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

THRIVE RENEWABLES PLC (02978651), active, since 1994. 6 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Silver Spinney Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 80 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire80 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction111 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells120 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Thrive Renewables
Owner
Thrive Renewables (Wicken) Limited
Location
Silver Spinney Farm, Deanshanger Road, Wicken, Milton Keynes, Northamptonshire, MK19 6BS, United Kingdom
Planning authority
West Northamptonshire
Planning application
S/2019/0086/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/2019/0086/FUL, with what the planning evidence pack adds for this site.

Every application in West Northamptonshire · Alerts for applications and incidents near here

  • 14 January 2019 Planning application submitted
  • 19 April 2021 Construction started

None found. The register holds no published incident that names Silver Spinney Farm. If you know of one, report it (confidential reports are anonymised).

Has Silver Spinney Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Silver Spinney Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Silver Spinney Farm?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 April 2021.
Where is Silver Spinney Farm?
7.9 km north-east of Buckingham, Northamptonshire, United Kingdom (postcode MK19 6BS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).