Battery storage · United Kingdom
Feeder Road Battery Storage Facility (Feeder Road)
Operator Thrive Renewables · Owner Aura Power Storage Solutions Ltd
Operational20 MWData checked 16 November 2026Source record dated 22 January 2024
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Feeder Road Battery Storage Facility (Feeder Road) is a 20 MW battery storage site on the edge of Bristol, Avon, United Kingdom. Its planning application (19/04841/F) went to Bristol, City of on 3 October 2019 and was granted on 19 March 2020. It has been operating since 1 May 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 62 other energy sites within 10 km, 8 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Feeder Road Battery Storage Facility (Feeder Road) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
A day out costs this site about £1,461 at its earnings over the last 31 settled days (response and reserve auctions). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
THRIVE RENEWABLES PLC (02978651), active, since 1994. 6 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 20 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Thrive Renewables
- Owner
- Aura Power Storage Solutions Ltd
- Location
- Adjacent To St Philip's Marsh, Feeder Road, Land Off, Bristol, Avon, Avon, BS2 0TH, United Kingdom
- Planning authority
- Bristol, City of
- Planning application
- 19/04841/F
- First operating
- 2023
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 19/04841/F, with what the planning evidence pack adds for this site.
Every application in Bristol, City of · Alerts for applications and incidents near here
Timeline
- 3 October 2019 Planning application submitted
- 19 March 2020 Planning permission granted
- 1 January 2023 Construction started
- 1 May 2023 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Feeder Road Battery Storage Facility (Feeder Road). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Feeder Road Battery Storage Facility (Feeder Road) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Feeder Road Battery Storage Facility (Feeder Road); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Feeder Road Battery Storage Facility (Feeder Road)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 22 January 2024.
- Where is Feeder Road Battery Storage Facility (Feeder Road)?
- On the edge of Bristol, Avon, United Kingdom (postcode BS2 0TH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).