Battery storage · United Kingdom
Whitelaw Brae Wind farm
Operator Thrive Renewables
Awaiting Construction4 MWData checked 16 November 2026Source record dated 18 March 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Whitelaw Brae Wind farm is a 4 MW battery storage site 27 km south-west of Peebles, Strathclyde, United Kingdom. Its planning application (EC00002090) went to Scottish Government (S36) on 11 December 2014 and was granted on appeal on 7 December 2017. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Whitelaw Brae Wind farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
THRIVE RENEWABLES PLC (02978651), active, since 1994. 6 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Whitelaw Brae Wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 235 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 235 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 304 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 431 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Capacity
- 4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Appeal Granted)
- Operator or applicant
- Thrive Renewables
- Location
- Whitelaw Brae Wind Farm, Tweedsmuir, Biggar, Strathclyde, ML12 6QS, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- EC00002090
- Appeal reference
- WIN-140-4
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EC00002090, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 11 December 2014 Planning application submitted
- 25 November 2015 Appeal lodged
- 7 December 2017 Planning permission granted
- 7 December 2017 Appeal granted
- 7 December 2022 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Whitelaw Brae Wind farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Whitelaw Brae Wind farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Whitelaw Brae Wind farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Whitelaw Brae Wind farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 March 2025.
- Where is Whitelaw Brae Wind farm?
- 27 km south-west of Peebles, Strathclyde, United Kingdom (postcode ML12 6QS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).