Planning pack for this site, £295Other options

Solar · United Kingdom

Cotswold House, St Philips Road - olar Panels

Operator Private Developer

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 8 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cotswold House, St Philips Road - olar Panels is a 0.2 MW solar farm in Bristol, Gloucestershire, United Kingdom. Its planning application (23/04413/RE) went to Bristol, City of on 14 November 2023 and was granted on 10 June 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 75 other energy sites within 10 km, 60 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cotswold House, St Philips Road - olar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 1.4 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14162025Fire at Bristol hospital started in solar panels1.4 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol1.4 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol1.7 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Private Developer
Location
Cotswold House, St Philips Road, St Philips, Bristol, Gloucestershire, BS2 0JZ, United Kingdom
Planning authority
Bristol, City of
Planning application
23/04413/RE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/04413/RE, with what the planning evidence pack adds for this site.

Every application in Bristol, City of · Alerts for applications and incidents near here

  • 14 November 2023 Planning application submitted
  • 10 June 2024 Planning permission granted

None found. The register holds no published incident that names Cotswold House, St Philips Road - olar Panels. If you know of one, report it (confidential reports are anonymised).

Has Cotswold House, St Philips Road - olar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cotswold House, St Philips Road - olar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cotswold House, St Philips Road - olar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 July 2024.
Where is Cotswold House, St Philips Road - olar Panels?
In Bristol, Gloucestershire, United Kingdom (postcode BS2 0JZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).