Solar · United Kingdom

Manor Farm, Beachampton - Solar Farm

Operator Anesco Limited · Owner Quanesco Midco Limited

Awaiting Construction25 MWData checked 16 November 2026Source record dated 8 April 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Manor Farm, Beachampton - Solar Farm is a 25 MW solar farm 7.6 km east of Buckingham, United Kingdom. Its planning application (22/03492/APP) went to Buckinghamshire on 11 October 2022 and was granted on 12 January 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 69 other energy sites within 10 km, 40 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Manor Farm, Beachampton - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1448, Roof fire at new-build house with solar panels in Wellingborough, 34 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough34 kmSignificant
EIR-14932026Solar panels catch fire on Bedford warehouse roof35 kmMinor
EIR-15452024Fire involving solar panels on a building under construction in Kettering43 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Anesco Limited
Owner
Quanesco Midco Limited
Location
Manor Farm Barns Beachampton, Buckinghamshire, MK19 6DU, United Kingdom
Planning authority
Buckinghamshire
Planning application
22/03492/APP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/03492/APP, with what the planning evidence pack adds for this site.

Every application in Buckinghamshire · Alerts for applications and incidents near here

  • 11 October 2022 Planning application submitted
  • 12 January 2024 Planning permission granted
  • 12 January 2027 Planning permission runs out

None found. The register holds no published incident that names Manor Farm, Beachampton - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Manor Farm, Beachampton - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Manor Farm, Beachampton - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Manor Farm, Beachampton - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 April 2026.
Where is Manor Farm, Beachampton - Solar Farm?
7.6 km east of Buckingham, United Kingdom (postcode MK19 6DU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).