Planning pack for this site, £295Other options

Solar · United Kingdom

Sparrow Lodge Farm

Operator Elgin Energy · Owner Porto Holdings Limited

Awaiting Construction20 MWData checked 16 November 2026Source record dated 23 May 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sparrow Lodge Farm is a 20 MW solar farm 7.2 km north-east of Buckingham, Northamptonshire, United Kingdom. Its planning application (S/2019/2270/MAF) went to West Northamptonshire on 8 November 2019 and was granted on 8 March 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 63 other energy sites within 10 km, 39 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ELGIN ENERGY HOLDINGS LIMITED (07181686), active, since 2010. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sparrow Lodge Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1448, Roof fire at new-build house with solar panels in Wellingborough, 33 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough33 kmSignificant
EIR-14932026Solar panels catch fire on Bedford warehouse roof35 kmMinor
EIR-15452024Fire involving solar panels on a building under construction in Kettering42 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Elgin Energy
Owner
Porto Holdings Limited
Location
Land at Sparrow Lodge Farm, Wicken Park Road, Wicken, Milton Keynes, Northamptonshire, MK19 6BZ, United Kingdom
Planning authority
West Northamptonshire
Planning application
S/2019/2270/MAF

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/2019/2270/MAF, with what the planning evidence pack adds for this site.

Every application in West Northamptonshire · Alerts for applications and incidents near here

  • 8 November 2019 Planning application submitted
  • 8 March 2021 Planning permission granted
  • 8 March 2024 Planning permission expired

None found. The register holds no published incident that names Sparrow Lodge Farm. If you know of one, report it (confidential reports are anonymised).

Has Sparrow Lodge Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sparrow Lodge Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Sparrow Lodge Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 May 2023.
Where is Sparrow Lodge Farm?
7.2 km north-east of Buckingham, Northamptonshire, United Kingdom (postcode MK19 6BZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).