Operational6.4 MWChecked 6 October 2026Last changed in the dataset 6 November 2013

Technology
Onshore wind
Capacity
6.4 MW
Status
Operational
Operator or applicant
John Laing Environmental Assets Group
Location
Penrhys Rhondda Mid Glamorgan, Mid Glamorgan, United Kingdom
Planning authority
Rhondda Cynon Taf
Planning application
03/0226
Appeal reference
App/L6940/A/04/754
First operating
2011
Turbines
8

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 11 February 2003 Planning application submitted
  • 9 January 2004 Planning permission refused
  • 1 March 2005 Planning permission granted
  • 1 March 2005 Appeal granted
  • 1 April 2010 Construction started
  • 8 June 2011 Operational

None found. The register holds no published incident that names Penrhys Wind Farm/Ferndale Power Factory. If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.