Onshore wind · United Kingdom

Burton Wold Wind Farm - Northern Extension

Operator John Laing Environmental Assets Group

Operational14.4 MWData checked 16 November 2026Source record dated 21 December 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Burton Wold Wind Farm - Northern Extension is a 14.4 MW wind farm on the edge of Burton Latimer, Northamptonshire, United Kingdom. Its planning application (KET/2012/0556) went to North Northamptonshire on 29 August 2012 and was granted on 9 November 2012. It has been operating since 1 August 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 43 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 13 other sites and 511 energy sites within 40 km for Burton Wold Wind Farm - Northern Extension

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
14.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
John Laing Environmental Assets Group
Location
Burton Wold Wind Farm, Wold Road, Burton Latimer, Northamptonshire, NN15 5PU, United Kingdom
Planning authority
North Northamptonshire
Planning application
KET/2012/0556
First operating
2014
Turbines
9

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for KET/2012/0556, with what the planning evidence pack adds for this site.

Every application in North Northamptonshire · Alerts for applications and incidents near here

  • 29 August 2012 Planning application submitted
  • 9 November 2012 Planning permission granted
  • 21 October 2013 Construction started
  • 1 August 2014 Operational

None found. The register holds no published incident that names Burton Wold Wind Farm - Northern Extension. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Burton Wold Wind Farm - Northern Extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Burton Wold Wind Farm - Northern Extension; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Burton Wold Wind Farm - Northern Extension?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 21 December 2015.
Where is Burton Wold Wind Farm - Northern Extension?
On the edge of Burton Latimer, Northamptonshire, United Kingdom (postcode NN15 5PU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).