Battery storage · United Kingdom

Wold Road (land south of) Peak Power Generation Plant

Operator First Renewable Developments

Planning Permission ExpiredData checked 16 November 2026Source record dated 27 May 2020

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Wold Road (land south of) Peak Power Generation Plant is a battery storage site on the edge of Burton Latimer, Northamptonshire, United Kingdom. Its planning application (KET/2015/0751) went to North Northamptonshire on 22 September 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 44 other energy sites within 10 km, 8 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 9 other sites and 510 energy sites within 40 km for Wold Road (land south of) Peak Power Generation Plant

Members see the sites and incidents around this one, and every record behind them.

FIRST RENEWABLE DEVELOPMENTS LIMITED (07540571), active, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Status
Planning Permission Expired
Operator or applicant
First Renewable Developments
Location
Land To The South Of Wold Road, Burton Latimer, Wellingborough, Northamptonshire, Northamptonshire, NN9 5HW, United Kingdom
Planning authority
North Northamptonshire
Planning application
KET/2015/0751

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for KET/2015/0751, with what the planning evidence pack adds for this site.

Every application in North Northamptonshire · Alerts for applications and incidents near here

  • 22 September 2015 Planning application submitted
  • 21 October 2018 Planning permission expired

None found. The register holds no published incident that names Wold Road (land south of) Peak Power Generation Plant. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Wold Road (land south of) Peak Power Generation Plant had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wold Road (land south of) Peak Power Generation Plant; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wold Road (land south of) Peak Power Generation Plant?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 27 May 2020.
Where is Wold Road (land south of) Peak Power Generation Plant?
On the edge of Burton Latimer, Northamptonshire, United Kingdom (postcode NN9 5HW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).